It has been a long time since the last post.  This one is worth waiting for.   This is an immaculate main floor renovation.   This project started with a new sub-floor/insulation to improve sound dampening between floors.     Anyone that was downstairs couldn’t hear us lumbering around when we were finished with that floor.  New hardwood floors installed throughout main floor. The exterior walls that were exposed at the back of the house were re-framed and sprayed foamed.   The next step was moving a second floor bathroom from the back of the house to the middle area to accommodate a  larger kitchen.   Casing around windows affected by the renovation were replaced with casing that matched the existing style of the home,  thank you Royal Woodworking in Aurora (you can see the casing clearly around the door to the powder room or the window at the back of the kitchen).   All new cabinets were installed in the kitchen.  Take note of the barn board accent wall at the back of the kitchen and the fireplace surround at the front of the house.    The waterfall counter top  on the island is an amazing feature.

 

Before BGC :

20170327_125317 20170327_125309 20170327_125249 20170327_174431

 

After BGC :

Front entrance tiled and with metal inlay on the boarders.

20170619_152048

 

Barn board on fireplace chimney stack.   New stone under the fireplace.

20170619_144615

Door to the new 2 piece bathroom,   casing around door matches existing door and window casing.

20170619_144028

New mosaic tile floor in the bathroom.

20170619_143928

Spot that waterfall counter top on the island (below).

20170619_143818 20170619_143806

20170619_143520

There are small LED lights in the cabinets.   It is hard to see in this picture but there is a small mosaic tile back splash in the nook and about the stove.

20170619_144140